HomeLube EquipmentSALES & LINKSFILTERSServices & SalesPay OnlineFrequently Asked Questions For InspectionsAbout Our BusinessContact Information

ADEQ INSPECTION PAPERWORK

 

TO HELP YOU BE MORE PREPARED FOR AN INSPECTION BY ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY INSPECTORS, WE HAVE THIS CHECK LIST OF PAPERWORK YOU WILL NEED TO HAVE ON SITE FOR THE INSPECTOR TO SEE FOR THEIR INSPECTION. FOR YOUR BENEFIT, PLEASE KEEP ALL PAPERWORK SENT TO YOU FROM US FOR AT LEAST 5 YEARS.

 

  • ONE (1) FULL YEAR OF MONITORING FOR YOUR TANKS

EXAMPLE: OUR MONTHLY UST INSPECTION REPORT, ATG PRINT OUT SHOWING A YEARS WORTH OF PASSING TEST ON TANKS, SIR REPORTS, ECT.

 

  • LAST ANNUAL LINE TEST AND LEAK DETECTOR TEST OR ATG PRINT OUT IF YOU HAVE ELECTRONIC LINE LEAK DETECTORS SHOWING PASS TEST FOR EACH LINE WITHIN THE LAST YEAR

 

  • CATHODIC TEST DONE WITHIN THE LAST THREE (3) YEARS FOR STiP 3 TANKS OR IMPRESSED CURRENT SYSTEM. IF YOU HAVE AN IMPRESSED CURRENT SYSTEM OR SACRIFICAL ANODES. PLEASE TRY AND HAVE YOUR ENGINNERED CERTIFICATION FOR THE INSTALLATION OF THE SYSTEM. ALSO ON IMPRESSED CURRENT SYSTEMS, YOU MUST HAVE READINGS FROM THE RECTIFIER FOR AT LEAST EVERY 60 DAYS FOR THE YEAR

 

  • MONITORING WELL ASSESSMENT IF USING GROUNDWATER OR VAPOR MONITORING FOR YOUR FORM OF MONTHLY MONITORING.

 

  • ANY OTHER DOCUMENTATION YOU MAY HAVE SHOWING WHAT TYPE OF UST SYSTEM YOU HAVE INSTALLED FOR THE INSPECTOR TO VERIFY.

EXAMPLE: SIGNED CONTRACT FROM WHEN WORK WAS PERFORMED OR ANY PAPERWORK FROM A LICENSED CONTRACTOR WITH ADEQ WHO PERFORMED ANY WORK FOR YOU.

 

  • YOUR ADEQ CERTIFICATE POSTED WHERE THE INSPECTOR CAN SEE IT WHEN THEY ENTER YOUR FACILITY.

 

PUT ALL THESE DOCUMENTS AND PAPERWORK IN A BINDER OR FOLDER AND MARK IT ADEQ FOR THE INSPECTOR TO LOOK AT. THIS WILL HELP WITH YOUR INSPECTION.

 

 

IF YOU HAVE ANY QUESTIONS PLEASE CALL.